Generators Ireland

Call us:

Office hours:

9:00 am - 6:00 pm

contact us
Office Locations

We usually respond within 24 hours. Alternatively you’re welcome to call our offices.

gorey business park

Gorey Business Park, Ramstown
Gorey, Co. Wexford.
Generators Ireland.
Y25 Y2C8

Office: 05394 21599

Mobile: 087 256 2919

County Wicklow Power Specialists • M11 Fast Depot Dispatch

Generators Wicklow — Commercial, Farm & Standby Power

Supplying high-efficiency diesel generators, agricultural tractor PTO sets, and automated standby backup across all of County Wicklow with rapid delivery, certified installation, and 24/7 service from our depot via the M11 corridor.

Reliable Generators Wicklow Businesses & Farms Depend On

When securing emergency standby power in the Garden County, finding trusted generators Wicklow operations can count on is essential. Co. Wicklow presents a unique set of geographical challenges: exposed coastal communities like Greystones, Wicklow Town, and Arklow endure aggressive Atlantic and Irish Sea storm surges, while highland and inland agricultural zones across the Wicklow Mountains, Roundwood, and West Wicklow (Baltinglass and Blessington) frequently suffer prolonged grid dropouts during heavy snowfall and severe gales.

Severe weather warnings issued by Met Éireann routinely lead to overhead cable damage and transformer trips. For dairy parlours, poultry sheds, water pumping stations, and commercial cold storage facilities, even a three-hour electrical outage can trigger catastrophic operational losses, livestock distress, and spoiled inventory. Our heavy-duty standby and prime power generators provide fully autonomous protection, ensuring continuous 230V single-phase and 400V three-phase electrical supply the instant the national grid falters.

Every standby system engineered by Generators Ireland complies with the stringent grid connection, safety isolation, and anti-islanding standards defined by ESB Networks. For commercial and manufacturing facilities regulated under environmental noise and planning guidelines set by Wicklow County Council, our acoustic enclosures deliver super-silent attenuation down to 65 dB(A) at 7 metres, alongside double-walled bunded diesel fuel tanks that prevent environmental spillage.

Automatic Transfer Switch (ATS) Emergency Failover — Co. Wicklow

How our automated systems switch power seamlessly during severe Wicklow grid dropouts.

1
Grid Power Loss

ESB Networks Wicklow supply drops below 80% nominal voltage. The Deep Sea digital sensor instantly detects phase failure.

RESPONSE: 0 – 3 SECONDS

2
Diesel Auto-Crank

High-torque starter motor engages the engine. RPM stabilizes at 1,500 RPM, producing steady 50Hz frequency and clean sine wave voltage.

SPEED: 6 – 10 SECONDS

3
Load Transfer

Mechanically interlocked contactors isolate the mains supply completely before directing backup power to your main distribution board.

STATUS: FACILITY FULLY LIVE

4
Safe Retransfer

Once ESB mains stabilizes for 5 consecutive minutes, the ATS seamlessly restores mains power, initiates engine cooldown, and re-arms.

ZERO BACKFEED RISK

Specialized Generators Wicklow Sectors Rely On

Power demands vary considerably across County Wicklow. Our technical engineering team provides custom-tailored installations based on specific industry loads:

Agricultural & Dairy Milking Generators

Dairy farms in West Wicklow, Rathdrum, and Shillelagh cannot afford milking delays or bulk milk tank cooling failures. We supply both stationary diesel generators with automatic start and tractor-driven PTO generators (20kVA to 85kVA) equipped with heavy-duty gearboxes and AVR voltage regulation.

Recommended: 30kVA – 80kVA PTO / Diesel

Commercial Facilities & Retail Hubs

Supermarkets, hospitality venues, and medical practices in Bray, Greystones, and Wicklow Town require instant power for refrigeration, POS checkout terminals, security lighting, and server rooms. Silent canopied 40kVA to 150kVA diesel units protect customer trust and operational uptime.

Recommended: 40kVA – 150kVA Silent Canopy

Industrial & Infrastructure Projects

For quarrying, timber processing, pharmaceutical manufacturing, and coastal marine engineering in Arklow, heavy-duty three-phase diesel generators (200kVA to 1,000kVA) provide continuous prime power with synchronization capability and extended runtime fuel bulk systems.

Recommended: 200kVA – 1,000kVA Prime Power

Wicklow Generator Capacity Sizing & Fuel Specifications

Choosing the right capacity avoids dangerous under-powering (which damages electric motors) or wet stacking caused by operating a diesel engine below 40% load. Consult our guide below or review our complete buying a generator in Ireland guide for step-by-step motor inrush calculations.

Generator Size (kVA / kW) Voltage & Phase Typical Application in Wicklow Fuel Burn (75% Load)
15kVA / 12kW 230V Single Phase Residential homes, small farm workshops, dental clinics ~3.2 L / hr
30kVA / 24kW 400V 3-Phase / 230V Dairy milking parlours, service stations, bakeries ~5.8 L / hr
60kVA / 48kW 400V 3-Phase Supermarkets, nursing homes, food distribution depots ~11.5 L / hr
100kVA / 80kW 400V 3-Phase Hotels, leisure centres, light manufacturing facilities ~18.9 L / hr
250kVA / 200kW 400V 3-Phase Quarries, cold storage plants, data and telecom sites ~46.0 L / hr

Direct Generator Supply & 24/7 Servicing Across County Wicklow

From our depot located just minutes from the M11 corridor, our mobile service fleet delivers brand new and fully tested generators Wicklow customers require, providing prompt on-site commissioning and scheduled maintenance:

Bray & North Wicklow

Rapid access via the N11/M11 for commercial enterprises, healthcare centres, and light industrial units in Bray, Enniskerry, and Kilmacanogue.

Greystones, Delgany & Kilcoole

Ultra-quiet acoustic diesel generators ideal for noise-sensitive residential care facilities, restaurants, schools, and veterinary clinics.

Wicklow Town, Ashford & Rathnew

Harbour, logistics, and marine services along the central coastline, supported by rapid mobile emergency generator hire and maintenance.

Arklow & South Wicklow

Heavy industrial units, chemical engineering sites, and coastal maritime operations directly served from our Gorey depot within 20 minutes.

West Wicklow & Dairy Hinterland

Blessington, Baltinglass, Dunlavin, and Hollywood farms equipped with PTO tractor backup and automated stationary farm generators.

Upland & Mountain Communities

Laragh, Glendalough, and Roundwood properties shielded against extreme winter isolation with winterized engine block heaters and high-capacity bunded tanks.

Frequently Asked Questions: Generators Wicklow

How fast can you deliver a generator to a site in County Wicklow?

From our South East distribution centre located directly off the M11, standard deliveries across Arklow, Wicklow Town, and Bray arrive within 24 to 48 hours for in-stock sets. For critical emergency failures, our dispatch team provides urgent same-day delivery.

Do I need an Automatic Transfer Switch (ATS) for my business or farm in Wicklow?

An ATS is essential if your site requires uninterrupted automated protection without human intervention. The switch continuously checks mains voltage; when the grid fails, it automatically cranks the generator and transfers the load in under 10 seconds. For farms where someone is always on-site, a manual changeover switch can also be installed to ESB compliance standards.

What size generator do I need to run a modern Wicklow dairy parlour?

Most dairy farms with a 10-unit to 20-unit milking parlour, vacuum pumps, milk cooling tank, water heater, and scraper systems require a 30kVA to 50kVA generator. Larger herds or robotic milking systems typically require 60kVA to 80kVA sets to handle the electric motor startup surges.

Are your diesel generators compliant with Irish environmental and noise guidelines?

Yes. All our standby and prime power units feature heavy-duty galvanized sound-attenuated canopies and 110% fully bunded integrated fuel tanks, meeting Environmental Protection Agency (EPA) standards and Wicklow County Council noise abatement requirements.

Protect Your Wicklow Facility with Proven Standby Power

Explore our complete inventory of new and used generators in stock, or speak directly with our senior power engineers for site surveys, ATS installations, and fast delivery across County Wicklow.